(on Monday, Oct. 17, 2011)
The work day begun with holes being cut where the outlets are to be positioned.
When the wires could not be strung inside the wall, channels were created for the wire to go from one outlet to another. This wall has the new outlets that will be in our office area.
These outlets had to be repositioned because the original outlets will be covered with the new cabinets.
With the addition of the new cabinets in the corner the doorbell has to be moved. Here is the channel for the doorbell wire to be buried in the wall to above the door.
In our old kitchen the refigerator was in front of the heat/ac vent. Since we are swapping the location of the refigerator and stove that means the vent would be in back of the stove. Also, with the corner being filled with cabinets the heat/ac would have no where to do and would not get into the room. Therefore, we are moving the vent to have it come out in the toekick of one of the cabinets beside the stove. Here they have are chipped away the wall to start this process. I think this will acually get more heat/ac into the kitchen area.
Last night Tom worked on getting the cable wire inside the wall.
We also had to determine how much extra wire was needed to allow the TV to move around on the full-motion wall mount. The blue tape marks the exact spot!
Yes we are!
Looks like you are in the thick of things.