Day 2

This is a picture of how they are boxing in the pipes over the washer and dryer. When I looked at this it reminded me of how my dad built the walls in the kitchen for the upper cabinets. Then I thought – cabinet, why not have a cabinet for the laundry supplies. Make this corner look alot neater – so they are going to put in shelves w/doors over the dryer. Do you see me smiling?
The electrian came today and started to work with the wiring. We will be putting in new florcent lights that attach to the ceiling. No more dust bunnies hanging out on top of my lights.
We are not going to have the sheetrock go all the way around the duct work for the furance. It is already too low. So. they are going to close in above the duct (vent) and then paint what is still showing white.

More pictures to show the prep work on the ceiling for the sheet rock. I am getting really excited – I am sure that moving ALL the stuff is going to be worth it!

No pictures – but last night I started to try and pare down novelty fabrics that I have. After that the 100% cottons, but I will be keeping all the batiks. Watch e-bay for some great deals!

One Response to “Day 2”

  1. terificreations says:

    Mary Anne this looks like such a fun project. Do the guys work in the rain and were his feet smelly and I can’t wait to see the finished project, ‘specially since I’ve only visited the un-finished project in pictures.

    Teri

Leave a Reply